Acceptable Solution G13/AS1: Sanitary Plumbing
- The Logitech® G13 Advanced Gameboard gives you game-changing comfort and control. It has a naturally contoured design that follows the natural shape of your.
- Logitech G and Discord have partnered up to give gamers an exclusive experience when it comes to play. Download Logitech Gaming Software, fire up Discord, an.
- Naan Hub Dine In & Take Away Shop # 11, Shakeel Arcade Street # 87, behind bank Al-Falah G13/1, Islamabad Contact: 051 2323 522 Mobile: 0345 5898 320.
- RAVENOL J4D2002-1 LGC C13 Coolant Antifreeze Premix (G13) (1.5 Liter) 4.9 out of 5 stars 56. Host an Amazon Hub.
Acceptable Solution G13/AS2 provides a means of compliance with parts of Building Code Clause G13 Foul water, in particular sanitary plumbing. Requires the safe disposal of foul water to prevent illness and the loss of amenity due to odour and accumulated matter.
This resource is no longer current. The current versions are G13/AS1 (Second Edition, Amendment 8), G13/AS1 (Amd 9) (Second Edition, Amendment 9)
- Information provider
- Ministry of Business, Innovation and Employment
- Information type
- Acceptable Solution
- Format
- Cites
- This resource cites 12 documents (show Citations)
Description
Acceptable Solution G13/AS2 provides a means of compliance with parts of Building Code Clause G13 Foul water, in particular sanitary plumbing. Requires the safe disposal of foul water to prevent illness and the loss of amenity due to odour and accumulated matter.
Scope
This Acceptable Solution applies to above-ground non-pressure (gravity flow) sanitary plumbing for buildings having 3 levels or less and includes all pipework for foul water within, or on the building, including any basements.
The solution does not include:
a) Specialised types of sanitary fixtures or sanitary appliances used within buildings such as hospitals, laboratories and factories, or
b) The conveyance of industrial liquid wastes, chemical or toxic wastes and other wastes which cannot be discharged to a sewer without pretreatment
Previous versions:
G13/AS1 (Second Edition, Amendment 6)G13/AS1 (Second Edition, Amendment 5)
G13/AS1 (Second Edition, Amendment 4)
G13/AS1 (Amd 3) (Second Edition, Amendment 3)
For assistance with locating previous versions, please contact the information provider.
Notes/comments
This Amendment includes Alterations on:
- page 8 References
- page 33 G13/AS1 7.1.3
- page 50 G13/AS2 6.1.3
- page 51 G13/AS3 2.0.1
G13/AS1 Amendment 5 Second Edition, Amendment 5
G13/AS1 Amendment 4 Second Edition, Amendment 4
G13/AS1 (Amd 3) Amendment 3 Second Edition, Amendment 3
For assistance with locating previous versions, please contact the information provider.
This Amendment includes Alterations on:
- page 8 References
- page 33 G13/AS1 7.1.3
- page 50 G13/AS2 6.1.3
- page 51 G13/AS3 2.0.1
This resource is not cited by any other resources.
Acceptable Solution G13/AS1: Sanitary Plumbing
This document is not CITED BY any other resources:
Acceptable Solution G13/AS1: Sanitary Plumbing
Description
Acceptable Solution G13/AS2 provides a means of compliance with parts of Building Code Clause G13 Foul water, in particular sanitary plumbing. Requires the safe disposal of foul water to prevent illness and the loss of amenity due to odour and accumulated matter.
View on Information Provider website Download this resource (PDF, 2.7MB)Acceptable Solution G13/AS1: Sanitary Plumbing
This resource is no longer current. The current versions are G13/AS1 (Second Edition, Amendment 8), G13/AS1 (Amd 9) (Second Edition, Amendment 9)
Description
Acceptable Solution G13/AS2 provides a means of compliance with parts of Building Code Clause G13 Foul water, in particular sanitary plumbing. Requires the safe disposal of foul water to prevent illness and the loss of amenity due to odour and accumulated matter.
View on Information Provider website Download this resource (PDF, 2.7MB)Acceptable Solution G13/AS1: Sanitary Plumbing
This document CITES:
New Zealand Standards
- AS/NZS 1260:2009
G13/AS1 cites AS/NZS 1260:2009 PVC-U Pipes and fittings for drain, waste and vent applications from 10/10/2011
- AS/NZS 2032:2006
G13/AS1 cites AS/NZS 2032:2006 Installation of PVC pipe systems from 30/09/2010
- AS/NZS 2033:2008
G13/AS1 cites AS/NZS 2033:2008 Installation of polyethylene pipe systems from 10/10/2011
- AS/NZS 3500.2:2015
G13/AS1 cites AS/NZS 3500.2:2015 Plumbing and drainage - Part 2: Sanitary plumbing and drainage from 1/01/2017 until 31/10/2019
- AS/NZS 4401:2006
G13/AS1 cites AS/NZS 4401:2006 (R2016) Plastics piping systems for soil and waste discharge (low and high temperature) inside buildings - Polyethylene (PE) from 30/09/2010
- AS/NZS 4936:2002
G13/AS1 cites AS/NZS 4936:2002 Air admittance valves (AAVs) for use in sanitary plumbing and drainage systems from 30/09/2010
- NZS 3501:1976
G13/AS1 cites NZS 3501:1976 Specification for copper tubes for water, gas, and sanitation - SPONSORED from 1/10/2001
Australian Standards
- AS 1589-2001 (Reconfirmed 2018)
G13/AS1 cites AS 1589-2001 (R2018) Copper and copper alloy waste fittings from 30/09/2010
- AS 2887-1993
G13/AS1 cites AS 2887-1993 (R2017) Plastic waste fittings from 1/10/2001
Other
- ASSE 1050:1991
G13/AS1 cites ASSE 1050:1991 Performance requirements for air admittance valves for plumbing DWV systems stack type devices from 1/10/2001
- ASSE 1051: 1992
G13/AS1 cites ASSE 1051:1992 Performance requirements for air admittance valves for plumbing drainage systems from 1/10/2001
- BS EN 12380:2002
G13/AS1 cites BS EN 12380:2002 Air admittance valves for drainage systems. Requirements, test methods and evaluation of conformity from 1/10/2001
Table of Contents
2.1 Pipes, traps and fittings
3.1 Water trap requirements
3.2 Water trap dimensions
3.3 Water trap location
3.4 Floor outlets
4.1 Layout
4.2 Access for cleaning
4.3 Diameter
4.4 Gradient
4.5 Fixture discharge pipes serving waste water fixtures
4.6 Fixture discharge pipes serving soil fixtures
4.7 Discharge stacks
5.1 Venting required
5.2 Vent pipes
5.3 Diameter of vent pipes
5.4 Gradient of vent pipes
5.5 Connection of vents to fixture discharge pipes
5.6 Discharge stack and relief vents

5.7 Termination of open vent pipes
5.8 Air admittance valves
6.1 Jointing methods
6.2 Pipe supports
6.3 Thermal movement
6.4 Fire separation
7.1 Test methods
2.1 Fill materials
3.1 Bends
3.2 Junctions
3.3 Gully traps
3.4 Grease traps
3.5 Gradient of drains
3.6 Diameter of drains
4.1 Ventilation requirements
4.2 Diameter of drain vent pipe
5.1 Jointing
5.2 Construction
Logitech G Hub G13
5.3 Construction methods
5.4 Trench width
5.5 Placing and compacting
5.6 Proximity of trench to building
5.7 Access points
Logitech G13 New

5.8 Additional requirements for drains installed under buildings
Logicool G Hub G13
5.9 Access to drains under buildings
5.10 Disused drains
6.1 Testing
G Code G13 Example
1.1 Scope
